July/August 2002, Volume 58, No. 4, pp.
14–17
Nuclear safety: Uh-oh in Ohio
On
February 16, the Davis-Besse nuclear plant in Ohio went offline for its
thirteenth refueling and maintenance outage. During the shutdown, plant
operators were inspecting the top of the vessel that houses the reactor
core when they found more boric acid accumulation than they expected.
Later, while making repairs to a nozzle that passes through the vessel
head, they found something completely unexpected—a hole.
The worst damage
ever
Davis-Besse is a 25-year-old,
single-unit pressurized water reactor located in Oak Harbor on the shore
of Lake Erie, about 30 miles east of Toledo. Inside its containment
building is the reactor pressure vessel, and inside that is the core.
Sixty-nine hollow nozzles stretch through the vessel head down into the
core; through the nozzles, control rods can be lowered to stop reactions.
The carbon steel walls of the reactor vessel are 6 inches thick and
internally lined with noncorrosive stainless steel cladding, and designed
to withstand up to 2,500 pounds of pressure per square inch.
On
the vessel head, boric acid corrosion had eaten through the 6 inches of
carbon steel and carved out a cavity 4 inches by 7 inches wide. Between
35–40 pounds of carbon steel were simply missing, and the only thing that
contained the radioactive, highly pressurized coolant water inside the
vessel was the thin skin of stainless steel cladding. Not designed to
endure such pressure, the lining had started to bulge outward. If the
lining had been breached, a loss of coolant accident would have resulted.
This could have led to a severe accident.
The damage was the worst
of its kind ever seen, and it had taken years to develop. Warning signs of
the corrosion, and the leaking nozzle cracks that made it possible, had
gone repeatedly undetected by FirstEnergy Corp., the plant operator.
An acceptable
risk
“It shouldn’t have happened; it was
preventable. FirstEnergy failed on several fronts to detect and prevent
this corrosion,” says Jack Grobe of the Nuclear Regulatory Commission
(NRC).
The inspections that led to the discovery of the corrosion
had been requested by the NRC in August 2001 after unusual circumferential
cracking was found on nozzles at two units of South Carolina’s Oconee
nuclear station. After that incident, the NRC asked that inspections for
the same kind of cracks be completed before December 31, 2001, at the 13
pressurized water reactors that it deemed most susceptible to similar
cracking. Davis-Besse was one of these plants, but the NRC agreed that
inspections there could be postponed until mid-February.
After the
corrosion at Davis-Besse was discovered, the granting of that extension
looked to some like a lapse in judgment on the NRC’s part. David Lochbaum,
a nuclear safety engineer with the Union of Concerned Scientists, says the
NRC’s response to the problems at Oconee was timely and appropriate, but
allowing Davis-Besse to postpone inspections was questionable. “After the
Oconee follow-up, they drew a line in the sand and they then allowed
Davis-Besse to cross it,” Lochbaum says. “That seems a concern.” Lochbaum
also wants to know why FirstEnergy wanted to push back the inspection
date.
At the same time FirstEnergy was telling the NRC that it was
safe to postpone inspections, they were negotiating to buy a new
replacement vessel head, giving the appearance that the plant may have
been aware of problems and wanted to put off inspections as long as
possible, Lochbaum says. “There’s a concern that they might not have
provided the NRC with a full set of information.”
FirstEnergy says
it had no indication of either circumferential cracking or corrosion until
it carried out the recent inspections. The utility wanted to buy a new
vessel head, says spokesman Richard Wilkins, because it planned on
applying for license renewal and because it wanted to avoid nozzle
cracking in the future.
“Although we didn’t see any indications of
a problem, we knew because of industry experience that eventually we
probably would,” says Wilkins. “And if that was the case, we would
continually have to be doing these inspections, replacing these nozzles,
which is time consuming and expensive. We didn’t want to have to deal with
this chronic issue.” In October 2001 FirstEnergy decided to buy a new
vessel head, and ordered one in early 2002.
The postponement of
inspections at Davis-Besse is a non-issue, according to Brian Sheron of
the NRC’s office of nuclear reactor regulation. “People keep saying, ‘Oh,
you let them go an extra six weeks,’ but it had no effect on the fact that
they found corrosion,” Sheron says. “That corrosion was there on December
31, that corrosion was there [in May 2001].”
There was “a fair
amount of uncertainty” about the technical issues of circumferential
cracks, like crack growth rates. But when the NRC calculated the risk
factors associated with letting the plant operate until February 16—and
got FirstEnergy’s commitment to take on extra safety precautions to offset
those factors—the agency decided the risk was acceptable. In fact, says
Sheron, the results of the inspections ultimately bore out the assumption
the NRC made when assessing the risk: that no major circumferential cracks
would be found on the nozzles. “Notwithstanding the corrosion part of it,
the plant was in fact safe,” he says.
Boric acid problems
It’s the
“corrosion part of it” that’s got folks wondering. How was it that such
severe, long-term degradation could go unnoticed by the utility? In its
own root cause analysis report to the NRC, dated March 22, FirstEnergy
estimates that the crack that allowed the leakage of coolant water, which
led to the boric acid deposits and corrosion, could have started as long
ago as 1990.
Simple boric acid accumulation on reactor vessel
heads is not terribly meaningful. A tiny amount of boric acid, between
1,000–2,000 parts per million, is dissolved into reactor coolant water,
which is not corrosive. Because coolant leaks at high temperatures
(500–600 degrees Fahrenheit) as steam, and because the vessel head is also
very hot, the steam quickly evaporates and leaves behind boric acid
crystals, which look like sugar. It is common for pressurized water
reactors to have small amounts of boric acid crystals on vessel heads.
“That’s expected on a regular basis,” says Grobe of the NRC. “It’s
normally cleaned up with a brush and a vacuum—not a big deal.”
But
at Davis-Besse, the boric acid was allowed to accumulate until it became
“substantive.” Beginning in approximately 1996, the boric acid deposits
grew and changed in consistency until about 70 percent of the vessel head
was covered with a hard, lava-like coating ranging from 1–3 inches thick.
Somehow, in this environment—no one understands the mechanics of it yet—a
pit in the carbon steel began to corrode rapidly.
The NRC
documented boric acid corrosion of carbon steel components as early as
1979. In 1987 the NRC issued an information notice to operators of
pressurized water reactors about an incident at the Turkey Point 4
reactor: “Another severe instance of boric acid-induced corrosion of
ferritic [carbon] steel components on the pressure boundary of a
[pressurized water reactor].” More than 500 pounds of boric acid
accumulation had to be removed in that case. (Nine-hundred pounds of
deposits were removed at Davis-Besse.)
After the Turkey Point and
other incidents, in 1988 the NRC requested that all operators of
pressurized water reactors implement a program to monitor and control
boric acid.
FirstEnergy admits that if it had properly implemented
its boric acid control program, it would have found the corrosion earlier.
“We didn’t do adequate inspections,” says FirstEnergy’s
Wilkins.
Missed
opportunities
Failing to catch the buildup
on the vessel head was the most significant warning sign FirstEnergy
missed, says Grobe, but it was not the only one.
There were two
other “telling” indications that should have tipped off operators to the
problem, Grobe says. The first was when filters in the airborne radiation
monitors in the containment building began showing unusual coloration and
content, including boric acid and rust, and needed more frequent changing.
The second was when boric acid and rust began accumulating in the coils of
the containment air coolers. A more oblique indicator, Grobe says, was an
unusual pattern of coolant leakage over the years.
But none of
these factors, says Wilkins, is necessarily indicative of a serious
problem. “We noted all these things,” he says. “There were no really overt
signs that pointed to a cracked nozzle issue.” The boric acid buildup
could have stemmed from a leaking flange, not a cracked nozzle; the
coolant leakage was too insignificant to detect; and the rust in the
filters could have come from a number of sources besides the vessel head,
he says.
Still, “We had some opportunities to find this problem
earlier,” Wilkins says. “We missed those
opportunities.”
Bad design, bad
decisions
Part of the problem, he says, was
the design of the service structure above the reactor pressure vessel. The
structure is built above the vessel head with only two inches of clearance
between it and the head’s curved dome, making inspection difficult. The
boric acid buildup made matters worse.
“It makes it very difficult
to maintain and clean the reactor head,” says Wilkins. “So one of the
things we’ve done already to fix that is to modify the service structure.”
By cutting openings for service ports into the side of the service
structure, inspecting and cleaning the vessel head will be much easier and
more effective.
These modifications were first considered at
Davis-Besse more than a decade ago, only to be repeatedly deferred.
Installation of “multiple access ports” was proposed in March 1990, after
boric acid was found to have leaked from flanges onto the reactor head. In
September 1993, the request was voided. The next year the idea was put
forward again. The reasons, from FirstEnergy records: “There is no access
to the reactor vessel head or the [nozzles] without installation of the
modification. Inspections of the reactor vessel head for boric acid
corrosion following an operating cycle is difficult and not always
adequate. Video inspections of the head . . . do not encompass a 100
percent inspection. Cleaning of excessive boric acid residue from the
reactor vessel head also does not encompass 100 percent. Installation of
these inspection openings would allow a thorough inspection and cleaning
of the head.”
Ten months later, in March 1995, the modification
was deferred at the request of the plant engineering manager, who was
“waiting for additional information prior to concluding that the $250K
cost is worth the increased degree of assurance.” The decision to defer
modification was, according to FirstEnergy’s March 22 root-cause report, a
“contributing cause” to the corrosion.
Lessons learned?
To repair
the corrosion, FirstEnergy made two proposals to the NRC: The damaged area
could be cut out and capped with a six-inch thick metal weld, or
FirstEnergy could replace the entire vessel head. The NRC decided the
replacement option was better, and on May 23 the utility announced it had
bought an unused vessel head from an unfinished nuclear plant in Michigan.
(The new vessel head that FirstEnergy ordered earlier this year will not
be ready until 2004.) Refurbishing and installing the Michigan head is
expected to cost between $55 million and $75 million, and FirstEnergy
hopes to be ready for restart before the end of the year.
Being
ready to restart and getting the NRC’s approval to do so, however, are two
different things. Immediately after it learned of the corrosion, the NRC
initiated a special panel to oversee and assess the plant’s performance
during its extended shutdown. Grobe, who chairs the panel, says that the
panel will stay in existence after it gives Davis-Besse the green light to
restart, until it judges the plant ready to return to the routine
oversight process.
Other changes may be on the way, and events at
Davis-Besse may permanently alter the way the NRC regulates its licensees.
The agency is now reviewing the industry’s proposal for changes to the way
reactor pressure vessel heads and nozzles are inspected.
“There
are definitely going to have to be permanent changes in the [vessel head]
inspection program,” says the NRC’s Sheron. Those changes will come about
largely as a result of the discovery of the circumferential cracks at
Oconee.
In the aftermath of Davis-Besse, “Whether there’s going to
be other changes in terms of how the NRC inspects, or whether we need to
put additional requirements on licensees making sure they do thorough
inspections, that’s for the Lessons Learned Task Force,” says Sheron. The
NRC task force, announced May 20, is comprised of agency managers and
staff independent of operations at Davis-Besse. Its job is to figure out
what needs to change at the NRC to make sure something like Davis-Besse
doesn’t happen again. Its conclusions are expected in early September.
“We’re planning on learning from this opportunity,” says Grobe.
Oversight and
investigations
To many, the events at
Davis-Besse raise concerns not only about FirstEnergy, but also about
whether the NRC is an effective regulator. Cong. Marcy Kaptur of Ohio and
Cong. Edward Markey of Massachusetts were among those asking questions—a
long list of questions, in fact. In a joint May 1 letter to NRC Chairman
Richard Meserve, Kaptur and Markey state that “These events indicate that
we only very narrowly averted a nuclear catastrophe of the magnitude of
Three Mile Island or worse.” The letter requests responses to 22 main
questions—about five pages-worth—including questions on the adequacy of
the safety systems that would have been used if the corrosion had caused a
breach in the vessel head. The NRC has said it will answer the questions
before mid-June. Kaptur, whose district is home to Davis-Besse, has said
she thinks the plant should remain offline.
That outcome would
please Terry Lodge, an attorney and anti-nuclear activist who lives in
Kaptur’s district. Lodge, who co-founded the Toledo Coalition for Safe
Energy more than 25 years ago in response to the planning and construction
of Davis-Besse, has been “mildly impressed” with the NRC’s response so
far, but he doesn’t trust it to last. “I’m seriously wondering if the NRC
is going to wait until a time, six months or a year from now, when this
thing is going to be old news, and then cave in and simply allow the
utility to run through some shallow technical fixes and put that thing
back online,” Lodge says. “The NRC’s complicity is so grave that there
absolutely has to be an outside, credible scientific and engineering
review of whether Davis-Besse should be allowed to continue.”
And
the Toledo Coalition for Safe Energy, along with 14 other local, national,
and international organizations, petitioned the NRC on April 24 to allow
an independent team of four experts to do just that. Lochbaum of the Union
of Concerned Scientists wrote the petition on behalf of the groups.
“Our concern in the petition we submitted was that the NRC had
tunnel vision,” Lochbaum says. “The reactor vessel head and its situation
is getting all of the NRC’s attention, and [FirstEnergy’s] attention as
well. We’re somewhat concerned that since over a quarter of a million
gallons of borated water leaked out through the hole since 1998, it may
have damaged things other than just the reactor vessel head.”
The
experts would ensure that the corrosion was an isolated event and was “the
only big issue they missed.” The NRC has accepted the petition, but has
not yet made a decision on whether it will be granted. Lochbaum hopes for
a decision sometime in June.
Granting the petition could be one
way the NRC demonstrates to the public that it’s taking Davis-Besse
seriously. And the public has shown interest: When the NRC team left
Davis-Besse after its initial investigation, between 400–500 citizens
showed up.
“That’s a fairly large turnout, and I don’t think they
turned up to cheer,” Lochbaum says. “In some respects, the NRC has a
chance to improve its public image. If it does a responsible job at
Davis-Besse—asks all the right questions and shows that it’s a tough
regulator—then I think the broader public will feel better. If it looks
like it’s putting the company’s schedule ahead of safety, then that will
hurt its public image down the road.”
The NRC seems acutely aware
of the need for openness. Its Web site (www.nrc.gov) now features a link
dedicated to providing the public with information on the Davis-Besse
incident, including extensive links to related documents, correspondence,
and news updates. And the NRC’s Office of Investigations is looking into
possible criminal violations committed by FirstEnergy.
“We have
initiated an investigation because the circumstances of the case appear
that there could be more than just a normal oversight or error,” Grobe
says, although he declined to comment on what the specific violations
might be.

|